hvac system start up

EQUIPMENT START-UP AND CALIBRATION OF HVAC SYSTEM

System commissioning is carried out in accordance with GMP requirements

An integral part of the Termovent Engineering offer consists in installation start-up works and adjustment of performance of automation equipment and electric drives.

System commissioning consists in cleaning, rinsing, filling and testing of installation, visual and functional check of the automation equipment as well as setting of the system parameters (optimal start, optimal operation mode, alarm set-point determination, tolerances, delay times, etc.). Our offer includes complete adjustment of the system operation to the on-site equipment in order to create the desired air state in each room and ensure reliable and functional operation of the HVAC system.

As an integral part of the equipment start-up, Termovent Engineering provides measurement of parameters with calibrated measuring equipment. We have equipment for measuring of temperature, pressure, air volume flow and water flow in an HVAC system.

Commissioning of HVAC systems and measurement of critical parameters is performed in accordance with ISO14644 and GAMP 5, in line with the previously agreed and adopted text of protocols which represent an integral part of the validation documentation.
 
 
  
Clean Room Specialists
Clean Rooms are specially constructed, environmentally controlled enclosed spaces, where particles of a size 0.3 microns and larger have negative impact on production process. They are widely used in semiconductor manufacturing industry, pharmaceutical, medical devices and biotechnology production, and similar.